 |
- Crushing Section: -
The raw materials mainly limestone, clay, coke are crushed in
the separate crushers and stored automatically into the
respective silos
|
 |
- Storage & Proportioning: -
The different raw materials are extracted from the silos in the
desired proportion through weigh feeders and conveyed to raw
mill.
|
 |
- Raw Milling: -
The raw mix is ground into a Ball Mill at desired fineness to
produce Raw Meal, and transported for Homogenizing.
|
 |
- Blending & Homogenization: -
The raw meal is homogenized in the blending silos, and is
stored automatically into a storage silo for feeding to the
kiln.
|
 |
- Palletizing & Burning: -
The nodules are made into a nodulisor and charged into the kiln
for burning. The clinker after discharge is stored in the
clinker yard through deep Bucket Elevator.
|
 |
- Clinker/gypsum crushing, storage &
proportioning: -
Clinker & Gypsum after crushing stored into the hoppers and
extracted in the desired proportion with the help of table
feeders and transported to the Cement mill Hopper.
|
 |
- Cement Milling: -
The clinker & Gypsum mix is ground in the cement mill to
produce cement.
|
 |
- Storage & Packing: -
The cement is stored into the cement silos and aerated, tested
and packed for dispatch
|