Capital subsidy for Biomass
Gasification Plants and Coal Gasification Plants coupled with 100% producer gas engine in industry
would be as follows :
Institutions such as Engineering / Medical Colleges and Religious / Charitable institutions working purely on nonprofit basis and not registered under Companies Act will also be covered under the Scheme. Institutions that have already set up gasifier system with 100% producer gas engine under SADP programme will not be covered under this Scheme The capital subsidy for institutional gasifier systems would be as follows :
Carbon emission is a major cause of global warming. It is due to use of fossil fuels such as coal and petroleum in thermal power plants and automobiles. Therefore any project undertaken to improve the energy efficiency in the utilities or renewable sources of energy, qualify for carbon credits. According to Kyoto protocol, carbon has become a tradable commodity with an associated value. One ton of CO2 reduced through a CDM project, when certified by a designated operational entity, is known as a CER(certified emission reduction), which can be traded. As Biomass Gasification is a renewable energy product, so user can avail the CDM benefits. We also undertake following activities in addition to turnkey supply of Biomass Gasification Plants :
Our biomass gasification plants and coal gasification plants are guaranteed against any manufacturing defect for a period of 12 months
from the date of commissioning or 18 months from the dispatch (whichever
is earlier).
Our Gasifier system is also guaranteed for the following:
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||